SigenStack Label kit Installation Instructions
This Label kit makes the following assumptions about the installation scenario
- Sigenergy Sigenstack.
- Main metering panel is same location as main switchboard. Include an additional round PV ES label if not.
- Battery system location is not hard to find, or in a large building. Include a map or drawing at MSB and/or fire panel.
- Not installed in a BESS room, or BESS room only has 1 door. Include additional voltage and current labels (one for each door to the BESS room).
- Designed for 2 x inverters/BESS. Include additional DC system isolator label, numbered.
- DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit). Include labels to identify the different types of circuits at intervals not less than 2m.
- Inverter and equipment to be operated in event of a shutdown not necessarily close to each other.
- Power sensor or no power sensor.
- There may be DC cables installed in ceiling space.
- Disconnection points or DC isolators.
- Assume no 3rd party inverters.
- Not designed for solar only (must have battery).
- Inverters connected to MSB directly or to Sub board or to A.C. Combiner board.
- Generator or no generator
- No switchboards electrically connected between MSB and switchboard IES is connected to. Include additional “Warning multiple supplies, isolate…..”
- Inverter adjacent to switchboard, or not.
- Assuming no EV connected
- No IPSD