This Label kit makes the following assumptions about the installation scenario

  • Sigenergy SigenStack.
  • Main metering panel is same location as main switchboard. Include an additional round PV ES label if not.
  • Battery system location is not hard to find, or in a large building. Include a map or drawing at MSB and/or fire panel.
  • Not installed in a BESS room, or BESS room only has 1 door. Include additional voltage and current labels (one for each door to the BESS room).
  • Designed for 2 x inverters/BESS. Include additional DC system isolator label, numbered.
  • DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit). Include labels to identify the different types of circuits at intervals not less than 2m.


Link to instructions for ACSW-LABEL-SIGENSTACK-HYBRID-PRO

  • Inverter and equipment to be operated in event of a shutdown not necessarily close to each other.
  • Power sensor or no power sensor.
  • There may be DC cables installed in ceiling space.
  • Disconnection points or DC isolators.
  • Assume no 3rd party inverters.
  • Not designed for solar only (must have battery).
  • Inverters connected to MSB directly or to Sub board or to A.C. Combiner board.
  • Generator or no generator
  • No switchboards electrically connected between MSB and switchboard IES is connected to. Include additional “Warning multiple supplies, isolate…..”
  • Inverter adjacent to switchboard, or not.
  • Assuming no EV connected
  • No IPSD