Our label kits have been designed for SolarEdge BESS with following scenario:
- SolarEdge BESS system
- Up to 4 SolarEdge Home Batteries (Single phase),
Or up to 5 SolarEdge Three Phase Home Batteries. - Up to 2 SolarEdge Single phase Home Hub Universal Inverters,
Or 2 SolarEdge Single Phase Home Genesis Inverters,
Or 1 for each,
Or 1 SolarEdge Home Hub Universal Three Phase Inverter. - For 2 single phase inverters installed, each inverter only able to connect up to 2 single phase batteries.
- When single phase inverter installed, which able to connect up to 3 single phase batteries (Combiner box required when more than 2 single phase batteries connected to 1 inverter).
- Up to 4 PV strings.
- Combiner box or no combiner box.
- SolarEdge Backup Interface installed, or no SolarEdge Backup Interface installed
- Backup or no backup
- Partial backup or whole house backup
If your installation falls outside this scenario, additional labels will be required.
- Generator or no generator
- SolarEdge Meter installed or no SolarEdge Meter installed
- Inverter directly connect to MSB or distribution board
- Main metering panel is same location as main switchboard.
- Battery system location is not hard to find, or in a large building.
- Not installed in a BESS room, or BESS room only has 1 door.
- DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit).
- Inverter and equipment to be operated in event of a shutdown not necessarily close to each other.
- There may be DC cables installed in ceiling space.
- Disconnection points or DC isolators.
- Assume no 3rd party inverters and batteries.
- No switchboard connect between IES and MSB.
- Inverter adjacent to switchboard or not.
- No EV connected.
- No IPSD