Our label kits have been designed for SolarEdge BESS with following scenario:

  • SolarEdge BESS system
  • Up to 4 SolarEdge Home Batteries (Single phase),
    Or up to 5 SolarEdge Three Phase Home Batteries.
  • Up to 2 SolarEdge Single phase Home Hub Universal Inverters,
    Or 2 SolarEdge Single Phase Home Genesis Inverters,
    Or 1 for each,
    Or 1 SolarEdge Home Hub Universal Three Phase Inverter.
  • For 2 single phase inverters installed, each inverter only able to connect up to 2 single phase batteries.
  • When single phase inverter installed, which able to connect up to 3 single phase batteries (Combiner box required when more than 2 single phase batteries connected to 1 inverter).
  • Up to 4 PV strings.
  • Combiner box or no combiner box.
  • SolarEdge Backup Interface installed, or no SolarEdge Backup Interface installed
  • Backup or no backup
  • Partial backup or whole house backup


If your installation falls outside this scenario, additional labels will be required.

  • Generator or no generator
  • SolarEdge Meter installed or no SolarEdge Meter installed
  • Inverter directly connect to MSB or distribution board
  • Main metering panel is same location as main switchboard.
  • Battery system location is not hard to find, or in a large building.
  • Not installed in a BESS room, or BESS room only has 1 door.
  • DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit).
  • Inverter and equipment to be operated in event of a shutdown not necessarily close to each other. 
  • There may be DC cables installed in ceiling space. 
  • Disconnection points or DC isolators.
  • Assume no 3rd party inverters and batteries. 
  • No switchboard connect between IES and MSB.
  • Inverter adjacent to switchboard or not.
  • No EV connected.
  • No IPSD