Tesla BESS with Backup Gateway Installed
Tesla BESS without Backup Gateway
Roof Section
Individual label breakdown guide
|
Label |
Instruction |
|
|
1 |
|
To be installed adjacent to battery enclosure or on all doors to the room where the battery is located. |
|
2 |
|
To be installed adjacent to battery enclosure or on all doors to the room where the battery is located.
|
|
3 |
|
To be installed adjacent to the Tesla Powerwall and adjacent to the equipment to be operated in event of a shutdown (usually the switchboard the inverter is connected to).
|
|
4 |
|
To be installed below each shutdown procedure label. |
|
5 |
|
To be installed adjacent to battery enclosure or on all doors to the room where the battery is located.
|
|
6 |
|
To be installed on the white space on the bottom left hand side of the plaque (if you wish), or any other location you prefer. Not a required label so can be omitted. Engrave details as you wish or stick your own logo/sticker on top. |
|
7 |
|
Where both solar and a battery is installed, this label is to be installed adjacent to the Tesla Powerwall. |
|
8 |
|
When more than 1 battery system (Tesla Powerwall) is installed, this label is required to be installed adjacent to 1 of the inverters. Not required when only one battery system is installed. |
|
9 |
|
To be installed adjacent to each Tesla Powerwall. Label kit includes suitable labels if 3 Tesla Powerwall are installed, if there are more, additional labels need to be sourced. |
|
10 |
|
To be installed adjacent to each DC Switch (Right side of the Tesla Powerwall as per shutdown procedure) on the Tesla Powerwall. |
|
11 |
|
When more than 1 battery system (Tesla Powerwall) is installed, these labels shall be installed adjacent to each Tesla Powerwall. When only 1 battery system is installed, neither of these labels is required. |
|
12 |
|
If enclosed A.C. isolators are installed between the switchboard and the Tesla Powerwall, install these labels adjacent to the relevant isolator/s. |
|
13 |
|
To be installed on Tesla backup gateway (when installed) as the shutdown label references this. |
|
14 |
|
To be installed on MSB and all distribution switchboards electrically connected between the MSB and the switchboards to which the Tesla Powerwall is directly connected. 2 labels are provided in our kits. |
|
15 |
|
To be installed on the switchboard which the Tesla Powerwall is directly connected to. |
|
16 |
|
Where the Tesla Powerwall is not connected directly to the MSB, this label is to be installed adjacent to the main switch of the switchboard it is connected to. |
|
17 |
|
To be installed adjacent to the switch to which the non backup 3rd party solar inverter is connected to. (Three phase solar inverter cannot connect to Tesla Backup Gateway backup port) |
|
18 |
|
To be installed adjacent to the switch to which the backup 3rd party solar inverter is connected to. |
|
19
|
|
To be installed adjacent to each switch that the Tesla Powerwall is connected to. This label is to be used when the system has a backup function (backup gateway installed). For non-backup systems, use label No. 20 instead. |
|
20 |
|
To be installed adjacent to each switch that the Tesla Powerwall is connected to. This label is to be used for a non-backup system. When more than 2 Tesla Powerwall units are connected to a switchboard that is electrically connected to load circuit. Label No. 21 shall be used instead. |
|
21 |
|
To be installed adjacent to each switch that the Tesla Powerwall is connected to.
|
|
22 |
|
To be installed adjacent to the main isolator for the backup loads. If there is no main isolator for these loads (or there is no backup loads), this label is not required. |
|
23 |
|
To be installed adjacent to the main isolator for the non-backup loads. If there is no main isolator for these loads (or there is no non-backup loads), this label is not required. |
|
24 |
|
To be installed adjacent to the main switch on the MSB. |
|
25 |
|
To be installed adjacent to the switch the Tesla remote meter is connected to. If Tesla remote meter is not installed, this label is not required. |
|
26 |
|
To be installed adjacent to the Tesla remote meter. If Tesla remote meter is not installed, this label is not required. |
|
27 |
|
To be installed adjacent to the switch the Backup Gateway is connected to. If no gateway is installed, this label is not required. |
|
28 |
|
To be installed adjacent to the hot water main switch on the MSB. |
|
29 |
|
To be installed to the switchboard where the system is configured for whole home backup, or where all load circuits within the distribution board or switchboard are backed up. |
|
30 |
|
To be installed adjacent to the main isolator in the essential loads. |
|
31 |
|
To be installed adjacent to each backed-up circuit. |
|
32 |
|
To be installed on MSB. 1 label is provided in our kits. To be filled out. |
|
33 |
|
To be installed on the MSB. Only required in Victoria. |
|
34 |
|
To be installed on MSB and main metering panel. Label kit includes 1 label assuming the meter panel is the same location as the MSB, if this is not the case an additional label is required. Install the “SW” label on top of the “DP” where rooftop DC isolators are used instead of disconnection points. |
|
35 |
|
To be installed on MSB and main metering panel. Label kit includes 1 label assuming the meter panel is the same location as the MSB, if this is not the case an additional label is required. |
|
36 |
|
To be installed on MSB or meter box and Fire panel. SDS included is for 5kWh and 8kWh battery modules, please remove the irrelevant pages (if any) according to which battery modules have been installed. |
Roof Section
|
37 |
|
Where DC cabling is installed within a ceiling space, this label is to be installed adjacent to the access point into the ceiling.
|
|
38 |
|
To be installed adjacent on each DC isolator (not required if disconnection points are used instead of rooftop isolators). |
|
39 |
|
To be attached to the PV module or structure within 300mm of all disconnection points (not required if rooftop isolators are used instead of disconnection points). |
|
40 |
|
To be attached (typically zip tied) to positive and negative cables of all disconnection points (not required if rooftop isolators are used instead of disconnection points). |
Labels required for all installations, which are not included in our kit.
|
|
To be attached on DC cabling from the array to the inverter at intervals not less than 2m and at every change of direction. These labels are not included in the label kit and must be sourced separately. |
|
|
To be installed on MSB and fire panel shown on a plan (Map or drawing) when the battery system locations that are difficult to find or where the inverter (IES) is not within 3 meters and fully visible from the switchboard. This sign must indicate location of shutdown procedure and inverter. This label dose not included in the label kit and must be sourced separately. |
|
|
To be installed on MSB and fire panel shown on a plan (Map or drawing). This label does not included in the label kit and must be sourced separately. |