Deye Battery Label Kit instructions
Our label kits are specifically designed for Deye BESS installations that meet the following criteria:
- Deye system
- Up to 4 PV strings for each inverter.
- 2 Battery Stacks installed.
- Backup or no backup
- Partial backup or whole house backup
- No generator
- eye energy meter installed or no Deye energy meter installed
- Inverter directly connect to MSB
- Main metering panel is same location as main switchboard.
- Battery system location is not hard to find, or in a large building.
If your installation falls outside this scenario, additional labels will be required.
- Not installed in a BESS room, or BESS room only has 1 door.
- DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit).
- Inverter and equipment to be operated in event of a shutdown not necessarily close to each other.
- There may be DC cables installed in ceiling space.
- Disconnection points or DC isolators.
- No 3rd party inverters and batteries.
- Inverter adjacent to switchboard or not.
- No EV connected.
- No IPSD