GoodWe Label Kit installation guide

The GoodWe label kits are suited only if the following criteria is met:

  • GoodWe system
  • Up to 4 PV strings for each inverter.
  • 2 Battery Stacks installed.
  • ESA Seires
  • Backup or no backup
  • Partial backup or whole house backup
  • No generator
  • GoodWe smart meter installed or no GoodWe smart meter installed
  • Inverter directly connect to MSB
  • Main metering panel is same location as main switchboard.

If your installation falls outside these assumptions, additional labels are required.

Link to Instructions (V1-V3)

  • Battery system location is not hard to find, or in a large building.
  • Not installed in a BESS room, or BESS room only has 1 door.
  • DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit).
  • Inverter and equipment to be operated in event of a shutdown not necessarily close to each other. 
  • There may be DC cables installed in ceiling space. 
  • Disconnection points or DC isolators.
  • No 3rd party inverters and batteries. 
  • Inverter adjacent to switchboard or not.
  • No EV connected.
  • No IPSD