Our Sigenergy label kits have been designed for the following scenario:

  • Sigenergy systems
  • Main metering panel is same location as main switchboard.
  • Battery system location is not hard to find, or in a large building.
  • Not installed in a BESS room, or BESS room only has 1 door. 
  • Designed for 2 x inverters/BESS. 
  • DC and AC cables not in the same wiring enclosure without an insulating barrier (conduit).
  • Inverter and equipment to be operated in event of a shutdown not necessarily close to each other. 
  • Power sensor or no power sensor. 
  • There may be DC cables installed in ceiling space. 


If your installation falls outside this scenario, additional labels will be required.

  • Disconnection points or DC isolators. 
  • Assume no 3rd party inverters. 
  • Not designed for solar only (must have battery). 
  • Connected to MSB directly or to Sub board. 
  • Generator or no generator
  • No switchboards electrically connected between MSB and switchboard IES is connected to.
  • Inverter adjacent to switchboard, or not. 
  • Assuming no EV connected
  • No IPSD